Parts needed:
• (1) E10 - RIGHT HANDLE POST - W101644
• (1) N2 - PICKET - W101647
Hardware needed:
• (2) D - NUT BARREL WH 5/16x7/8 - H100005
• (2) AD - WASHER LOCK EXT12x19 - H100031
• (2) AC - WASHER LOCK EXT8x19 - H100030
• (1) K - BOLT WH 5/16x2 - H100012
• (1) H - BOLT WH 5/16x1-1/2 - H100010
• (4) BR - SCREW PFH 8x1-1/8 - H100088
Fort Assembly
Phase 15
Phase Notes
• Assemble with hardware as shown.
H
AC
M14
E10
AD
D
K
AC
D
G4
N2
AD
BR
BR
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Step 1: Attach 'E10' Right Handle Post to
'G4' arched wall rail & 'M14' wall rail using
hardware 'K', 'H', 'AC', 'AD' & 'D', as shown.
1-15/16"
Spacing
Step 2: Attach 'N2' Picket to 'G4' arched
wall rail & 'M14' wall rail using Screws 'BR',
as shown.