DE
DA
H6
H6
L7
BR
BR
BR
BR
BR
N7
N6
N7
BR
N3
L2
BR
BR
Fort Assembly
Phase 26
Hardware needed:
• (38) BR - SCREW PFH 8x1-3/4 - H100089
• (10) DA - SCREW PWH 10x1/2 - H100132
Parts needed:
• (4) H6 - ROOF RAFTER - W101657
• (2) L2 - GABLE BOARD - W101663
• (2) N3 - GABLE BOARD - W100590
• (2) N6 - GABLE BOARD - W100593
• (4) N7 - GABLE BOARD - W100594
• (2) L7 - GABLE MOON - W100572
• (2) DE - PLATE FORT 5 HOLE GREEN - A100011
Phase Notes
• Assemble with hardware as shown.
Step 1: Attach 'L2' Gable Board to
(2) 'H6' Roof Rafters using
hardware 'BR', as shown.
Note: It is vital that the fort
be level before and after
each phase of assembly.
Step 2: Attach 'N3' Roof Rail
Support to (2) 'H6' roof rafters
using hardware 'BR', as shown.
Step 3: Attach 'N6' Gable
Board to 'H6' roof rafters
using hardware 'BR', as
shown.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
H6
H6
Step 4: Attach 'N7' Gable
Boards to 'H6' roof rafters
using hardware 'BR', as
shown.
Step 5: Attach 'DE' Plate Fort
Green to (2) 'H6' Roof Rafters
using hardware 'DA', as shown.
Step 6: Attach 'L7' Gable Moon to
'N3', 'N6' & 'N7' gable boards
using hardware 'BR', as shown.
N3