Fort Assembly
Phase 7
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (4) O1 - WINDOW SLAT - W101688
• (1) M7 - HANDLE WALL BOARD - W101652
• (1) M16 - WALL RAIL - W101653
Hardware needed:
• (10) BR - SCREW PFH 8x1-1/8 - H100088
• (1) F - BOLT WH 5/16x1 - H100008
• (2) AC - WASHER LOCK EXT 8x19 - H100030
• (1) AD - WASHER LOCK EXT 12x19 - H100031
• (1) B - NUT BARREL WH 5/16x5/8 - H100004
• (1) AA - LAG SCREW WH 5/16x2-1/2 - H100028
Step 1: Attach 'O1' Window Slats to
'G1' arched wall rail, 'N4' Window
Trim & 'M5' wall boards using Screws
'BR', as shown.
O1
O1
M5
M5
N4
E2
O1
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
G1
F
AC
M16
BR
B
AA
AC
M7
AD
Step 2: Attach 'M16' Wall Rail to 'E4'
deck upright using Lag Screw 'AA' &
Washer 'AC', as shown.
Step 3: Attach 'M7' Handle Wall
Board to 'M16' & 'G6' wall rails
using hardware 'F', 'AC', 'AD' &
'B', as shown.
E4
Center the
Window Slats
O1