6 Ft Rock Wall Green
Phase 3
Phase Notes
• Assemble N7 to top of rails as shown. See detail below.
• Using N7 as a guide, pre-drill top edge of rails with a 1/5"
drill bit. Failure to pre-drill may result in board
splitting.
SCREW PFH 8x1-1/2
PRE-DRILL FOR EACH SCREW
THESE SURFACES FLUSH
N71
QTY DESCRIPTION LABEL
2 SCREW PFH 8x1-1/2 BP
1 ROCK WALL END BOARD N71