MACHINE START UP - PRELIMINARY OPERATIONS
2 of 2
STEP
ACTION
DESCRIPTION
5
Check
pneumatic
supply
pressure.
Check the pneumatic supply pressure.
Initial adjustment of pressure gauges:
Check that the pressure gauge of the balancing cylinders (2) indicates a
working pressure of 6 bar.
If the pressure shown is not the proper working pressure, use the
balancing cylinder pressure regulator (1) to increase or decrease the
pressure.
Check that the pressure gauge for door closing/piece blocking (5)
indicates a working pressure of 6 bar.
If the pressure shown is not the proper working pressure, use the
door closing/piece blocking pressure regulator (4) to increase or
decrease the pressure.
Check that the spindle cooling pressure gauge indicates a working
pressure of 6 bar.
If the pressure shown is not the proper working pressure, use the
spindle cooling pressure regulator (7) to increase or decrease the
pressure.
Summary of Contents for MASTER
Page 4: ...Chap 0 IV 4 Page intentionally left blank ...
Page 5: ...CHAPTER 1 Foreward Chap 1 1 16 1 Foreword CHAPTER ...
Page 7: ...CHAPTER 1 Foreward Chap 1 3 16 Page intentionally left blank ...
Page 20: ...MASTER Instruction Manual Chap 1 16 16 Page intentionally left blank ...
Page 21: ...CHAPTER 2 Safety information Chap 2 1 36 2 Safety information CHAPTER ...
Page 56: ...MASTER Instruction Manual Chap 2 36 36 Page left intentionally blank ...
Page 59: ...Chap 3 3 27 CHAPTER 3 Page intentionally left blank ...
Page 83: ...Chap 3 27 27 CHAPTER 3 ...
Page 84: ...CHAPTER 4 Installation Chap 4 1 32 4 Installation CHAPTER ...
Page 178: ...CHAPTER 6 Maintenance Chap 6 1 30 6 Maintenance CHAPTER ...
Page 207: ...MASTER Instruction Manual Chap 6 30 30 Page left intentionally blank ...
Page 208: ...CHAPTER 7 Messages Alarms Chap 7 1 31 7 Messages Alarms CHAPTER ...
Page 238: ...CHAPTER 7 Messages Alarms Chap 7 31 31 Page left intentionally blank ...