Instrument Care
© b2 electronic GmbH
DHV0086 Rev06
100
9 Instrument Care
Cleaning
DANGER
Electric Shock Hazard
Never assume that equipment is safe to handle without using the
necessary safety equipment and earthing procedures.
Disconnection procedures must comply with local safety
regulations�
• Before disconnecting test lead, DUT must be discharged and earthed.
• Earth connections must be removed last!
HV CABLE
Clean the HV Cable connection points after use before storing.
Maintenance and Repairs
NOTICE
Authorized personnel only!
Repairs and maintenance should only be performed by authorized b2
personnel.
Annual inspection by authorized b2 staff is recommended.