Test Procedure
© b2 electronic GmbH
DHV0086 Rev06
56
5�3�2
Configuring Auto Test Sequence on the HVA Unit
Steps NS1-NS19 describe how to configure a test sequence.
Step
Procedure
(Configure auto test sequence)
NS01: Edit Sequences
Select “Edit Sequences”.
NS02: EDIT or NEW?
The “Edit Sequences” menu displays the
sequences already stored in memory.
To create a new sequence, select the
“New” option on the right-hand side of the
screen.
NS03: Title
For entering a title for the test sequence,
activate the keyboard and type the title.