Test Procedure
© b2 electronic GmbH
DHV0086 Rev06
53
Step
Procedure
(Run a manual test)
MR8: Set Test Voltage
(if not preset in step MS8)
Rotate navigation the knob
41
to modify
the voltage value.
MR9: Test
Test begins automatically.
The timer value indicates the remaining
testing time. The bottom line of the screen
displays the preset values.
MR10-1: Test End - New Phase
Display indicates end of manual test.
For testing the next phase, select the
“Next Phase” button and push in/click the
navigation knob
41
.
MR10-2: Test End - New Test
Display indicates end of manual test.
For starting a new test, select “Next Test”
button and push in/click the navigation
knob
41
.