27
5-3-1. Initial commissioning
The following description takes you step-by-step through commissioning the device and all
the necessary configurations for the Foundation Fieldbus™:
1. Open the configuration program.
2. Load the device description files or the CFF file into the host system or the configuration
program. Make sure you are using the right system files (see Section 4-4).
3. Note the DEVICE_ID on the device nameplate for identification in the process control
system (see Chapter 1 “Identification”).
4. Switch the device on.
→
The first time you establish a connection, the device reacts as follows in the configuration
system:
- e.g. : TIC-012 (tag name PD-TAG)
- 0DFC9602-xxxxxxxxxxx (DEVICE_ID)
- Block structure:
Display text (xxx... = serial number)
Base index
Description
RS_xxxxxxxxxxx
400
Resource Block
TB_S1_xxxxxxxxxxx
500
Transducer Block temperature sensor 1
TB_S2_xxxxxxxxxxx
600
Transducer Block temperature sensor 2
TB_DISP_xxxxxxxxxxx
700
Transducer Block “Display”
TB_ADVDIAG_xxxxxxxxxxx
800
Transducer Block “Advanced Diagnostic”
AI1_ xxxxxxxxxxx
900
Analog Input function block 1
AI2_ xxxxxxxxxxx
1000
Analog Input function block 2
AI3_ xxxxxxxxxxx
1100
Analog Input function block 3
PID_ xxxxxxxxxxx
1200
PID function block
ISB_xxxxxxxxxxx
1300
Input Selector function block
Note: The device is delivered from the factory with the bus address “247” and is thus in the
address range between 232 and 247 reserved for readdressing field devices. A lower bus
address should be assigned to the device for commissioning.
5. Using the DEVICE_ID noted, identify the field device and assign the desired tag name
(PD_TAG) to the fieldbus device in question.