Cubola
®
Solidare
®
EN 20-04-2018
11
Assembly Cubola
®
Solidare
®
Sub-composition legs
1.
Shorten the legs to the correct size.
2.
Place the drilling template on the profile and drill 7 holes according to the 'top of leg’ pattern.
3.
Drill the centred hole up to 20 mm. This hole is for the cable entry.
4.
Turn the profile 90° (quarter turn) and drill the same pattern again. If the leg is fitted with support
beams on 3 sides (in case of a connected system), the pattern must also be drilled on the third side.
5.
Place the drilling template against the bottom of the profile and drill according to the bottom of leg
pattern.
6.
Also drill two holes on the other side. Preferably drill the holes on the same side as the holes on the
top of the profile.
7.
Fasten the mounting adjusting plate to the mounting profile using countersunk bolts.
8.
Place the leg on the profile and fasten the 4 bolts on the side. You can opt to first fasten the adjusting
plates to the mounting location against the wall before placing the profile on it.
9.
Insert the mounting part leg into the top of the profile
10.
Temporarily fasten the mounting profile using 2 bolts and nuts or loosely fit the adjusting plate
mounting profile into the leg.
11.
Loosely fit the cover plates, bolts and screws into the leg or fasten them temporarily