Add a detail view
5
With the Door and Window folder selected, click
.
6
In the Add View dialog box, select Detail View, and click OK.
7
On the Add Detail View worksheet, enter
X-Door Jamb at Brick Wall
for Name, and click Next.
8
On the Context page, verify that no levels are selected, and click Next.
9
On the Content page, verify that the Constructs folder is cleared.
You verify that all constructs are cleared so that no constructs are referenced into this view.
10
Click Finish.
11
On the Views tab, double-click X-Door Jamb at Brick Wall to open the drawing in the drawing area.
12
In the lower-right corner of the drawing area, click the scale value, and select 1 1/2" = 1'- 0".
Use detailing tools
13
Right-click the title bar of the tool palettes, and click Detailing.
156 | Chapter 4 Producing Construction Documents