8.2 Lifting arm assembly
•
Hang in the standard lifting arm and then place an acid-free multi-purpose grease into the
joint bolts in each case from above into the hole and then insert the enclosed locking ring.
The lifting arm bolts must be secured on both sides as otherwise a reliable
connection is not given between the lift rails and lifting arm.
8.3 Commissioning
Before commissioning, a single safety inspection must be done (use the "single safety
inspection" form)
If the lift set up is done by a specialist (factory trained assembler) then he can also do the
safety inspection. If the set up is done by the operating company then a specialist must be
tasked with the safety inspection.
The specialist confirms seamless operation of the lift on the set up protocol for single safety
inspection and releases the lift for use.
After commissioning please complete the assembly protocol and send to the
manufacturer immediately.
8.4 Changing the assembly location
To change the assembly location the pre-conditions must be met according to the assembly
guidelines. The location change is to be done according to the following sequence:
•
Move the lift rails to about half height.
•
Disconnect electrical supply lines to the lift from mains power.
•
Loosen cables between both columns.
•
Remove the lifting arm (remove locking rings on the lifting arm bolts,
•
Pull out the lifting arm bolts and remove the lifting arm).
•
Loosen the anchor fastenings.
•
Carefully transport the lift column using appropriate auxiliary means (e.g. crane, forklift,
etc.) to the new assembly location.
•
Assemble the lift according to the procedure during assembly and anchoring before first
commissioning.
Use new anchors. The old anchors are no longer fit for purpose.