Opera ting Ma nua l a nd Inspection Book
SMART LIFT 2.30 SL, 2.35 SL, 2.40 SL / HYMAX S 3000, 3500, 4000
20110015 OPI
52
Version 1.0
Figure 23: Cable path when using risers and cross-pipes
B) without using risers and cross-pipes (sub-floor)
•
There is the option of running power and electrical cables below the floor. This prevents
the need for risers and cross-pipes (cable bridges) between both columns.
•
A foundation must be made according to plan 6348_EINBAU (integration) (page 32).
The opening for the cables are each found in the baseplate
•
The cables are laid in the shafts located in the columns.
•
During assembly of the lift, it must be ensured that the cables are not damaged during
column set up.
•
Feed the cable through the empty pipes in the foundation before the columns are set up.
Then move the columns to the installation location. Place the cables through the holes in
the baseplate and guide them through the column to the column head. Carefully place the
columns upright to prevent kinking or clamping.
•
Connect the cables according to the drawing (Figure 24).
•
When merging the cable connections at the head plate, ensure that the cable does not
contact rotating parts.
•
Pay particular attention to secure contact of the plug connections.