6
NOTE: Do not cut rail inside the house (aluminum chips are
very difficult to remove from carpets).
5. To cut the rail, use a standard chop saw with a 12"
blade designed to cut aluminum.
INSTALLATION SITE ELECTRICAL
REQUIREMENTS
The lift must be connected to a dedicated 120V AC 15A
electrical circuit.
RAIL INSTALLATION
1. Open the rail box and remove its contents.
2. Position the bottom rail (the rail with the end plate
attached directly on the stairs with the end plate
towards the bottom of the stairs and the plastic rack
facing up.
Place and object that measures 1/2" between end plate
and the floor.
See Figure 4-4.
Do not cut the end of the rail that contains the joint
holes. Remove the charger strips and wire harness
before cutting.
Atlas offers a rail jig that allows holes to be drilled
in the end of a rail.
Contact [email protected]
RAVE 2 INSTALLATION MANUAL INSTALLATION