19
12. Reinstall the two (2) plastic caps on the feet to cover
the threads.
See Figure 4-47.
13. Carefully move the fork with your hand to make sure
it operates smoothly. Allow it to go all the way to the
floor. Confirm that both feet sit level on the floor and
the hinge-joint is fully straight.
See Figure 4-48.
Be careful not to pinch your fingers when
moving the fork.
14. Follow the normal procedure for installing the rail
brackets and tighten them.
See page 9, step 8.
15. Test ride the unit a couple of times to verify that the
folding rail is operating properly.
RAVE 2 INSTALLATION MANUAL INSTALLATION