16
FOLDING RAIL INSTALLATION
1. Orient the two(2) rail brackets onto the folding rail, with
the nuts on the same side as the folding mechanism.
See Figures 4-35 and 4-36.
2. Expand and snap the two (2)
brackets over the rail, so the
top is in the bracket-groove.
See Figure 4-37.
NOTE: The photos in this section shows a left folding rail, assembled
to be installed on the left side of the stairway. Contact Atlas Technical
Support at 866-378-6648 for instructions on how to switch a folding rail
from the left side to the right side.
6. Flip the armrests back down, turn the red "On / Off
switch located on the top of the chassis to the "On"
position. You should hear a single beep. Test the
control switch on the armrest.
See Figure 4-34.
NOTE: It may be necessary to locate the retractor portion of the
seatbelt on the downward side of the lift to maintain close distance
to the wall.
RAVE 2 INSTALLATION MANUAL INSTALLATION