FINAL RAIL INSTALLATION
1. Install the remaining plastic rack pieces in the upper
rail.
See Figure 4-18.
2. Use a hacksaw or chop saw to cut the last plastic rack
piece flush with the rail end. Place something on the
floor to catch debris or mark and cut the rack outside.
The exposed, cut end of the plastic rack should be
facing the top end of the rail (the factory-cut side should
butt against the lower rack).
See Figure 4-19.
3. Slide the top limit cam into one of the cam slots on
either side, and tighten the pre-inserted Allen screw with
a 5/64" Allen wrench. This will be used to set the final
upper limit for the stair lift.
See Figure 4-20.
4. Remove the charging strips from the rail box.
Connect the charging strip connector to the power wire
that runs through the center of the rail from the lower
charging strips.
Insert the two (2) charging strips into the keyed slots
at the top of the rail (while standing on the top landing
looking down). The charging strip with the red wire
should be inserted into the left slot with the metal strip
facing out. The charging strip with the black wire should
be inserted into the right slot with the metal strip
pointing out.
See Figure 4-21.