
Software
45
Production Scheduling
1. To set the production scheduling time, from the Control Menu click on the
Production
Scheduling
button (Figure 6-35).
Figure 6-35 Control Menu – Production Scheduling
2. The Production Scheduling screen appears (Figure 6-36). Enter and activate the
Start Time
and
Stop Time
. Activate the Production Scheduling by clicking on the
Activate
button.
Figure 6-36 Production Scheduling – Enter Stop/Start Time
Production
Scheduling Button
Enter Start Time
Activate
Start Time
Activate Production
Scheduling
Activate
Stop Time
Enter Stop Time
Summary of Contents for TC V3
Page 1: ...Conformal Curing Oven TC V3 Operations Manual ...
Page 6: ......
Page 20: ......
Page 30: ......
Page 59: ......