18
Installation
5. Place the Cure Module over the selected location where it will be operated, but DO NOT
completely lower the forklift at this time.
6. Adjust the forklift height until the Cure Module is approximately at the height required to mate
with upstream and downstream systems.
7. When the Cure Module is at the approximate mating height, adjust the levelers such that they
are in contact with the floor.
8. When all four feet are equally in contact with the floor, gently lower the forklift blades.
Unpacking the Accessories
The accessories received will vary depending upon the configuration of your TC V3 Cure Module. These
accessories may include UV lamps, power supplies, power cords, tool and maintenance kits, and
equipment manuals. They may be in a crate, plastic wrapped on a skid, or secured to the Cure Module.
To Unpack the Accessories:
1. Locate the shipping list and place it in a safe location.
2. If the accessories were shipped in a wooden crate, use a flat bar and hammer to remove the
crate lid.
3. As you uncrate or unwrap each item, identify it, and place a check mark next to the item
name on the shipping list.
!
You may need to open the item in order to identify it. Once it has been identified, return
the item to its original box or bag.
!
If any parts or accessories are missing, please contact Customer Service.
TIP
Place each item from the accessories crate onto a cart for easy transport. If
possible, place the items next to the cure module onto which the items will be
installed.
Summary of Contents for TC V3
Page 1: ...Conformal Curing Oven TC V3 Operations Manual ...
Page 6: ......
Page 20: ......
Page 30: ......
Page 59: ......