37
Step 12: Roof Trim
37H
Roof Trim Caps are positioned as shown.
You will need for this page:
Slide
Peak Cap
legs under
Ridge Cap
and secure
Ridge Cap
ends with four
Small Bolts and Nuts
on
each end as shown.
1
3
If you are erecting a 10’x15’ (3,0 m x 4,6 m) or
larger building, install
Mid Roof Trim
along the re-
mainder of the roof edge.
Roof Trim
overlaps as
shown to the right.
2
Position
Left and Right Roof Trim
as shown below
and secure with
Small Screws
. Do not fasten the
last
Screw
on each end. Pay close attention to
where the
Left and Right Roof Trim
pieces are located.
Left Trim
2
80017
Right Trim
2
10620
Trim Cap (L)
2
Trim Cap (R)
2
Peak Cap
2
(QTY: 16+)
(QTY: 8)
80017
Left Roof Trim
10620
Right Roof Trim
10620
Right Roof Trim
80017
Left Roof Trim
(QTY: 4)
Insert a Small Screw where Roof
Trim overlaps after installing.
Position the
Roof Trim Caps
as shown below and
secure with a
Small Screw
. Using your thumb
and index fi nger, overbend the bottom fl ange of the
Side Roof Trim
at the corner inward enough so the right
and left
Roof Trim Caps
fi t onto right and left corners.
4
6015
Mid Roof Trim
6015
Mid Roof Trim
Mid Trim
0+
6015
SB
SS
SS
SB
SB
10’x15’ (3,0 m x 4,6 m)
building shown.