26
Step 9: Gables
26H
Edge Trim (Plastic)
GABLES ARE STACKED TOGETHER
DURING SHIPPING AND MAY BE MIS-
TAKEN FOR ONE GABLE! SEPARATE
GABLES BEFORE CONTINUING.
Right Gable
2
8576
Left Gable
2
8577
Edge Trim MUST cover Gable edge.
Install Edge Trim to cover Gable Edge
BEFORE doing ANY work with Gables.
Failure to do so could result in injury.
(QTY: 8)
Leg of Roof Beam Bracket must face center of Gable as shown.
You will need for this page:
Install
Roof Beam Brackets
on all
Gables
using
two
Small Bolts and Nuts
per
Bracket
. Leg of
Bracket
must face center of
Gable
as shown.
1
Bracket
4
6635
Edge Trim
4
69835
8576
8577
69835
6635
SB