36
Step 11: Continued
36H
You will need for this page:
At this point there should be only two
Roof
Panels
remaining. Install last two
Roof Panels
.
Because the last
Ridge Cap
is already in place
and has been secured at one end, you may need to
move the
Ridge Cap
slightly to secure the last two
Panels
to the
Main Roof Beams
.
11
With all
Roof Panels
in place, secure the bottom
of
Roof Panels
to the
Side Wall Angles
with
Small Screws
on both sides of the building.
13
DO NOT secure ends of Ridge Caps
until Peak Caps are in place.
Continue to apply Weather Stripping.
(QTY: 52+)
(QTY: 6)
• Bolts under Ridge Cap pass thru slots where
the End Roof Panel is overlapped by the Panel
next to it (labeled rib 5 below).
1
2
3
4
5
DO NOT fully tighten Ridge Cap
Bolts until you have both Ridge
Cap Bolts in place. This will ease assembly.
Bolts must be fully tightened before moving
on to the next page.
CUT
Finish weather stripping the roof under the
Ridge Cap
and cut the
Tape
just past the end
of the roof. Fold end of
Tape
under roof edge.
12
10’x15’ (3,0 m x 4,6 m)
building shown.
Roof Panel
2
7743
SB
SS
Alternate sides
while securing
roof panels.
SS
SS
SS
SS