Installation and Operation
68
8.5
RCP-3 Installation and Operation
8.5.1 RCP-3 Installation
Mounting the Rod Clamp Bridge
vertical
1. Open the rod clamp wing nut by
turning it counterclockwise.
2. If necessary, move the top screw to the middle hole.
Pushing away the clamping slide makes it easier to move the
screws.
3. Tighten both screws.
Mounting the Rod Clamp Bridge
horizontal
1. Open the rod clamp wing nut by
turning it counterclockwise
2. If necessary, move the top screw to the lower hole.
Pushing away the clamping slide makes it easier to move the
screws.
3. Tighten both screws.
8.5.2 Power ON / OFF
To turn the RCP-3
ON
and
OFF
, press and hold down the Jog-
Wheel until the ARRI logo appears on the display.
Summary of Contents for ARTEMIS 2
Page 1: ...TRINITY 2 System U S E R M AN U A L 01 09 2022 ...
Page 10: ...About the product 10 TRINITY Head 2 TRH 2 ...
Page 18: ...About the product 18 5 4 Pin Out ARTEMIS 2 TRINITY 2 ...
Page 25: ...Overview 25 7 Overview ...
Page 26: ...Overview 26 7 1 TRINITY 2 Head Overview Front right view ...
Page 27: ...Overview 27 Back left view ...
Page 28: ...Overview 28 Junction Box right side Junction Box left side ...
Page 29: ...Overview 29 Front panel Panel Right Panel Back ...
Page 34: ...Overview 34 ...
Page 35: ...Overview 35 7 4 Master Grip Overview ...
Page 40: ...Overview 40 7 6 Top Stage and Bottom Stage Overview ...
Page 45: ...Overview 45 7 8 Battery Mounting System Overview ...