FITOCLIMA 2500 HP
Mod. MI 271 EN / R00 23-10-2015
-70-
Section 6
Maintenance
6.1
General data
Regular care and maintenance are key factors for the smooth operation and life of the
equipment. Next we will present some maintenance work that does not replace professional
maintenance which is carried out by our technical support services.
All maintenance must be carried out with the chamber turned off.
The main switch must be set to “0”.
6.2
Basic maintenance
After each test
•
Check the proper functioning of sewage;
•
Control and clean inside the equipment;
•
Check if shown temperature matches the programmed one;
•
Check if relative humidity matches the programmed one.
Twice per year
•
Control and clean door seal;
•
Check wiring conditions (if necessary replacement);
•
Check sewage hoses conditions (if necessary replacement);
•
Check feeding tube for demineralised water conditions (if necessary replacement);
•
Check, with the help of a calibrated hygrometer inside the chamber, if process
variables values are correct. Checking must be done in three different temperature
and humidity points (ex: 10ºC, 25ºC and 40ºC for temperature and 40%, 60% and
80% for humidity);
•
Check if water outflow is done rapidly;
Summary of Contents for FITOCLIMA 2500 HP
Page 1: ...USER S MANUAL READ AND KEEP THIS INSTRUCTIONS ORIGINAL MANUAL EN ...
Page 3: ...FITOCLIMA 2500 HP Mod MI 271 EN R00 23 10 2015 3 ...
Page 13: ...FITOCLIMA 2500 HP Mod MI 271 EN R00 23 10 2015 13 Top view ...
Page 14: ...FITOCLIMA 2500 HP Mod MI 271 EN R00 23 10 2015 14 Side view ...
Page 15: ...FITOCLIMA 2500 HP Mod MI 271 EN R00 23 10 2015 15 3D view ...
Page 39: ...FITOCLIMA 2500 HP Mod MI 271 EN R00 23 10 2015 39 4 4 Set values configuration ...