4.10
PREP
ARING
THE
SITE
Sampler Location
A flat horizontal floor in a dry heated building is required to free-stand
the Sampler. Front access is required, to be able to operate the
Sampler and to retrieve the samples.
Electrical Power Supply Installation
A suitable electrical power supply should be provided for the Sampler
– See TECHNICAL SPECIFICATION, (page 8.8), which is terminated in
a switched, fused isolator, mounted adjacent to the Sampler.
The Sampler is provided with a 1.5 metre Power Cable. This cable
should be connected to the isolator.
(Optional) Ancillary Signal Connection
See Connecting the Sampler to Typical Auxiliary Equipment, Aquacell
S200 Sampler (page 4.11). Auxiliary Equipment should, if possible, be
positioned adjacent to where it is intended to mount the Sampler,
within reach of the Samplers Ancillary Signals Cable.
If it isn't possible to mount the Auxiliary Equipment adjacent to the
Sampler, then the cables to / from the Auxiliary Equipment should
be terminated in one or more Signal Isolators (not supplied by
Aquamatic) mounted adjacent to the Sampler. The isolators should be
connected to the Sampler via the Samplers Ancillary Signals Cable.
Isolators are necessary to protect the Samplers inputs / outputs fro
damaging electrical transients, which are sometimes induced in long
cables.
Summary of Contents for Aquacell S100
Page 1: ...Aquamatic Stationary Wastewater Samplers User Guide Issue 5 03...
Page 2: ......
Page 30: ...2 8 INTRODUCTION...
Page 58: ...4 24 PREPARING THE SITE...
Page 158: ...MAINTENANCE 7 18...
Page 160: ...TECHNICAL SPECIFICATION 8 2...
Page 161: ...TECHNICAL SPECIFICATION 8 3...