Part number 550-100-305/0916
48
AquaBalance
TM
W
ALL
M
OUNT
GAS
-
FIRED
WATER
BOILER
— C
OMBI
Boiler Manual
23
Wiring diagram — Combi Ladder
Figure 62
#OMBI,ADDER7IRING$IAGRAM
Legend
16 Blower
32
Central heating pump
42
DHW temperature sensor
44
Gas valve
72
Room thermostat (optional)
81
Ignition electrode
95
Mixing (diverting) valve
104(1)
Fuse
3.15A
104 (2) Fuse 630mA
114
Water pressure switch
136 Flow
meter
138
Outside temperature sensor (optional on Combi)
186
Return temperature sensor
191
Exhaust temperature sensor
278
Double sensor (h safety)
279
Transformer 115-24 Vac
284
Relay SPST-Coil 24 Vac
370 LWCO
(optional)
373
“OPENTHERM” communication (Not used)
NOTES:
1. All wiring must be installed
in accordance with N.E.C.
and any other national state
or local requirements.
2. Room thermostat should
be a dry contact type and
should draw power from the
control board: should not be
greater than 24 Vac and 500
mA.
3. Max. voltage and electric
current for the LWCO should
not be greater than 120Vac
and 3 Amp.
4. In case of questions during
installation please contact
your local distributor.