Page 13
Figure 13
Proceed as follows to perform the calibration test:
1. Fold down the spreading plate by opening the quick fasteners
(Figure 13).
2. For the calibration test, use the supplied sack or a different
hopper that can be attached to the metering unit to collect the
spreading material (Figure 14).
3. A precise description of how to perform the calibration test can
be found in the operating manual of your control box.
4. After beginning operation, you should verify the spread rate.
5. In particular, check the forward speed, the spread rate, and
distribution of the spreading material.
CAUTION!
For safety reasons, it is imperative to ensure that the
spreading plate is not switched on as long as the
spreading plate unit is folded down.
Operation on the road
When you start spreading, proceed as follows:
•
Start the implement on which the spreading is mounted.
•
Switch on the control box using the "On/Off" button.
•
Start the spreading plate using the "Spreading plate" button.
•
To start the spreading material delivery, now press the "Seeding
shaft" button.
•
When the work is finished, first switch off the seeding shaft, then
the spreading plate, and finally the entire control box with the
"On/Off" button.
The following points must be observed during operation:
•
The spreading plate should always be switched on during operation.
•
Verify the required spread rate!
Figure 14
Summary of Contents for UD 100 M1
Page 20: ...Page 20 10 Connection diagram Figure 23...
Page 27: ...Page 27 Notes...