![APS Resource HTC Kit Installation And Owner'S Manual Download Page 11](http://html1.mh-extra.com/html/aps-resource/htc-kit/htc-kit_installation-and-owners-manual_2956905011.webp)
PAGE 10
©2010 4Front Engineered Solutions, Inc. - APS Resource
AP4047 RA 11/10
INsTALLATION
Be certain that the lip hinges are clean and free
of debris.
The cylinder will be mounted with the rod end
connecting to the lip lug.
LIP CYLINDER INsTALLATION
1. Extend the lip to its maximum position.
2. Secure the lip in the completely extended
position.
3. Find an area at the front of the leveler to install
the lip cylinder without interfering with the
operation of the leveler. If not already there, cut
an opening of 4½" wide by 5" tall into the front
header to make room for the lip cylinder. See
Figure 14.
4. Weld the lip cylinder lip lug (front cylinder lug) on
the underside of the lip, against the front of the lip
spool, or close to the lip rod. See Figures 10 and
14.
(IF APPLICABLE)
5. Position the lip cylinder ramp lug (rear cylinder
lug) beneath the deck plate so that it is in line with
the front cylinder lug. The distance between the
mounting holes from the front cylinder lug to the
rear cylinder lug should be approx. 17". See Figure
10.
6. Tack weld the rear cylinder lug in position and
attach the lip cylinder at both ends. See Parts List
for clevis pin information.
7. Weld on bridge bar clevis below the opening cut
in the header, allowing enough room for the front
cylinder lug movement (approximately 5” below
hinge). See Figure 14.
8. Carefully lower the lip to the pendant position.
The lip cylinder must not stroke out when the lip is
extended or bottom out when the lip is closed.
9. After making sure that the lip cylinder has
the proper range, weld the rear cylinder lug
permanently in position.
Figure 14