APACHE-E SWIFT/LOGO10 PAGE # 16
DAWSON’S
APPROACH E GI EERI G
AH-64A ELECTRIC
13.1
Punch out six 1/4” balsa nose gearbox bodies, NGB-1.
Building a right and left sides glue three each together by align-
ing up all edges.
13.2
Lay out the assemblies to make a right and left gearbox.
Punch out one each of the nose gearbox front, NGB-2, and glue
on the front of each gearbox matching the outside profile.
13.3
Turn the assemblies over to work on the back side. Us-
ing two each of ¼” balsa gearbox bases, NGB-3, glue on the
back center of each gearbox.
13.4
Using the included aircraft photos sand the gearbox to
it’s final sanded shape.
13.5
Punch out the two 1/8” plywood engine intake swirl
vanes, EN-I, and sand to a desired finished shape. This is cos-
metic purposes only. The blades may be shaped like propellers
to simulate the intake swirl vanes. Depending on the desired
finishing technique it is recommended to glue in place later.
13.0 OSE GEARBOX
ASSEMBLY
13.6
Install the transmission bay assembly onto the fuselage.
Sand the back edge of the transmission bay to the final rounded
shape while blending it into the fuselage tail boom interface.
Sand the lower fuselage corners to the finished shape.
NGB-3
NGB-4
Summary of Contents for AH-64A APACHE SWIFT/LOGO 10
Page 1: ...A H 6 4 A A P A C H E S W I F T L O G O 1 0 APPROACH E GI EERI G www ApproachEngineering com ...
Page 36: ...23 0 FI AL ASSEMBLY APPE DIX A HELLFIRE LAU CHER ASSEMBLY ROCKET LAU CHER ASSEMBLY ...
Page 37: ...23 0 FI AL ASSEMBLY APPE DIX B 30 MM GU ASSEMBLY E GI E ACELLE ASSEMBLY ...
Page 38: ...23 0 FI AL ASSEMBLY F 1 SECTIO APPE DIX C VERTICAL FI ASSEMBLY ...
Page 39: ...23 0 FI AL ASSEMBLY F 3 SECTIO APPE DIX D VERTICAL FI ASSEMBLY ...
Page 40: ...23 0 FI AL ASSEMBLY HORIZO TAL FI ASSEMBLY APPE DIX E WI G ASSEMBLY ...
Page 41: ...23 0 FI AL ASSEMBLY APPE DIX F ...
Page 42: ...THREE VIEW DRAWING ...
Page 43: ...DOOR LOCATIONS AND DESCRIPTION ...
Page 44: ...WEAPONS PYLONS HORIZONTAL STABALIZER ENGINE EXHAUST ...