Copyright © 2019 AudioNote Kits
www.AudioNoteKits.com
[email protected]
Page 19
2.3 Installing the IEC Socket and Rocker Switch
Take the IEC socket and install it in position as shown below, with the fuse holder on top and the
GND lug on the bottom. Use M3 10mm CSK flat head screws and nuts to secure it.
Have a look at the picture below: Note the orientation of the Rocker Switch with the smaller
pair of tabs towards the side of the chassis and the larger pair towards the middle.
Install the self-locking Rocker Switch by pressing it in from the back of the chassis; it will snap
into position.
The correct orientation of the IEC and Rocker Switch
Here's a view of the rear of the chassis:
Summary of Contents for L5
Page 44: ...Copyright 2019 AudioNote Kits www AudioNoteKits com audionotekits rogers com Page 44 ...
Page 45: ...Copyright 2019 AudioNote Kits www AudioNoteKits com audionotekits rogers com Page 45 ...
Page 46: ...Copyright 2019 AudioNote Kits www AudioNoteKits com audionotekits rogers com Page 46 ...
Page 47: ...Copyright 2019 AudioNote Kits www AudioNoteKits com audionotekits rogers com Page 47 ...
Page 48: ...Copyright 2019 AudioNote Kits www AudioNoteKits com audionotekits rogers com Page 48 ...
Page 49: ...Copyright 2019 AudioNote Kits www AudioNoteKits com audionotekits rogers com Page 49 ...
Page 50: ...Copyright 2019 AudioNote Kits www AudioNoteKits com audionotekits rogers com Page 50 ...
Page 72: ...Copyright 2019 AudioNote Kits www AudioNoteKits com audionotekits rogers com Page 72 Appendix ...