![Anita GARUDAN GPS/G-1507 User Manual Download Page 12](http://html1.mh-extra.com/html/anita/garudan-gps-g-1507/garudan-gps-g-1507_user-manual_2943951012.webp)
ANITA ©
GPS/G serie
12
5. Installing and removing the shuttle case
Hold Handle and insert the shuttle ending up
clicking.
[Notice]
Before the shuttle is fully installed, starting
machine will cause thread coil in a mess or make
shuttle case flick out.
6. Thread tension adjustment
A. Needle thread tension adjustment (10)
As the figure shows, turn Screw clockwise to
increase the tension, while counterclockwise to
reduce the tension.
B. Bobbin thread tension adjustment
(11)
As the figure shows, turn Screw clockwise to
increase the tension, while counterclockwise to
reduce the tension.
7. Leading bobbin thread
A) Insert the shuttle into Thread Binding
Drive Shaft.
B) Stick Thread Binding Bar to the shuttle
and then start machine
C) When the shuttle is fully winded with
thread, Thread Trimmer
④
will cut the
thread.
On display you have to set winding the
bobbin (manual for software).
Fig. 12
Bobbin
case
Fig. 9
Fig. 11
Fig. 10
www.garudan.cz