Installation and Setup
48
Enova Digital Media Switchers - Hardware Reference Manual
Rack-Mounting Enova DGX 100 Series Enclosures
Rack-Mounting DGX 6400 Enclosures
The DGX 6400 Enclosure come with
CAUTION:
The Enova DGX 6400 weighs approximately 150 lb (68 kg) for a fully loaded enclosure.
Installation of the DGX 6400 requires a minimum of two people, we recommend using three people for lifting and
positioning the enclosure.
Ensure all parties involved in lifting the shipping box are prepared and follow local requirements as necessary for
the task (e.g., wearing proper lifting attire, number of lifters, etc).
1.
While the shipping box containing the enclosure is still on the pallet, cut loose and remove the outer straps.
2.
Remove the cardboard tray from the top of the reusable shipping box. Note that the shipping box is mounted on
wheels.
3.
Lift the shipping box off of the pallet.
4.
Unlock the four latches on the two sides of the shipping box.
5.
Lift the top of the shipping box straight up and over the Enova DGX 6400 and set aside.
6.
Attach the two provided Lifting Handles, using either the front or rear position as indicated in FIG. 15. Be sure to
tighten down all four screws securely on both handles.
CAUTION:
Do not use the board extractor handles to lift the enclosure or to maneuver it into place. Use the provided
Lifting Handles to maneuver it. Use a temporary shelf for support.
7.
Using the bottom of the shipping box, roll the enclosure into position.
8.
Select a position in the rack for the enclosure that is accessible and does not restrict airflow.
9.
Lift onto a temporary shelf (or some other type of support) in the rack.
10.
DGX-6400 only
- Align as closely as possible and then remove the lifting handles.
11.
Lift into position and install the rack ear screws (see FIG. 16 on page 49).
FIG. 15
DGX-6400 Lifting Handle Position Options