Page 56
EWCIE Technical Manual
14 Maintenance
The
EvacU EWCIE
should be maintained so as to comply with all standards / regulations applicable
to the country and location it has been installed. Failure to do so could put at risk compliance and the
integrity of the system. As a minimum it is recommended the following be used as a guide to periodic
maintenance especially if there is an absence of standards regulations.
General
To implement a site maintenance regime, responsibilities should be established by responsible
persons, training implemented if required, maintenance delegates appointed and all outcomes clearly
communicated to all parties.
Daily Operations (operator level)
The delegated operator checks for normal operation
If any faults are detected, record them in an established “Site Log Book” and report them to
the assigned body.
Ensure all faults are signed off as they are resolved and follow up on those that are still
outstanding.
Monthly Operations (operator level)
In addition to Daily Operational checks
Visually inspect in and around the panel for any signs of pests, moisture or general damage
Conduct a System test section 4.5.4 or applicable tests defined in Section 4.5.3 of this manual.
Ensure the Site Log Book” is up to date, faults have been attended to and the latest test are
recorded
Quarterly Operations (service contractor)
In addition to Monthly Operational checks
Check all internal connections and perform site specific tests. Refer test options defined in
section 4.5.3 of this manual as a guide.
Perform a “walk around” of the site to determine if the system integrity is free of possible faults
Ensure the Site Log Book” is up to date, faults have been attended to and the latest test are
recorded
Annual Operations (service contractor)
In addition to Monthly Operational checks
Initiate both a “lamp” test (section 5.7) and any other tests as determined necessary for the
site.
Inspect and test (as per the manufacturers specifications) batteries
Ensure the Site Log Book” is up to date, faults have been attended to and the latest test are
recorded
Replacement Components (service contractor)
Batteries and fuses are seen as the only field replaceable components.
If a board field change is required all necessary anti-static precautions must be taken.
Summary of Contents for EvacU
Page 6: ...Page 5 EWCIE Technical Manual Figure 1 Typical EWCIE System ...
Page 31: ...Page 30 EWCIE Technical Manual Figure 12 Standalone 3 x 50W with 10Amp PSU shown ...
Page 38: ...Page 37 EWCIE Technical Manual 10 9 6050 0008 EvacU Standalone 50W System Drawing ...
Page 40: ...Page 39 11 2 FireFinder plus 25W and 50W ...
Page 41: ...Page 40 11 3 LoopSense 25W and 50W ...
Page 43: ...Page 42 11 5 Multiple Amplifiers LoopSense FireFinder Plus ...
Page 44: ...Page 43 11 6 Multiple Amplifiers FireFinder ...
Page 45: ...Page 44 11 7 25W and 50W Amplifier with optional Audio Line Splitter ...