3-26 | Thermox WDG-V / VC / VCM with Blow Back
Remote Calibration Unit (RCU) Connections
If you don’t have the remote calibration unit (RCU) option, skip this sec-
tion.
Oxygen-Only Remote Calibration Unit Connections
Oxygen-Only Remote Calibration Unit (RCU) connections on the WDG-V
wiring card, and their RCU connections, are as follows:
- ZERO GAS - WDG-V Terminal Z to Pin 13 on RCU
- ASPIRATOR - WDG-V Terminal A to Pin 14 on RCU
- O
2
SPAN - WDG-V Terminal S1 to Pin 15 on RCU
- VALVE COMMON - WDG-V Terminal ‘V’ to pin 16 on RCU
Combustibles Remote Calibration Unit Connections
If you have the combustibles option (and a combustibles RCU), you must
also make the following connection:
• COMBUSTIBLE SPAN - WDG-V Terminal S2 to Pin 17 on RCU
For a WDG-VCM with hot-wire detector, Remote Calibration Unit con-
nects:
• METHANE SPAN - SWDG-V Terminal S3 to Pin 18 on RCU
Summary of Contents for Thermox WDG-V
Page 8: ...viii Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 16: ...xvi Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 22: ...1 6 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 34: ...2 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 57: ...Installation Guide 3 17 Figure 3 18 RCU flow diagram 3 Span Combustibles and Methane...
Page 58: ...3 18 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 64: ...3 24 Thermox WDG V VC VCM with Blow Back Figure 3 20 Wiring...
Page 73: ...AMEVision Display User Interface or Communications 4 5...
Page 76: ...4 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 88: ...5 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 91: ...Service and Parts 6 3 Figure 8 1a Wiring diagram for sensor...
Page 96: ...6 8 Thermox WDG V VC VCM with Blow Back Figure 8 3 Thermocouple replacement...
Page 100: ...6 12 Thermox WDG V VC VCM with Blow Back Figure 8 5 Flow sensor replacement...
Page 103: ...Service and Parts 6 15 Figure 8 7 Box Heater Replacement...
Page 105: ...Service and Parts 6 17 Figure 8 8 Combustible Block Heater Replacement...
Page 107: ...Service and Parts 6 19 Figure 8 9 Electronics Board Removal...
Page 114: ...7 4 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 118: ...A 4 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 126: ...A 12 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 132: ...A 18 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 137: ...PC Configurator Software A 23 Figure 23 Calibration_Calibration Results screen...
Page 138: ...A 24 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 144: ...A 30 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 156: ...A 42 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 164: ...A 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...