PC Configurator Software | A-25
Perform an Automatic Calibration
Scheduled Auto Calibration
1. Click on
Configuration
_
Auto Cal Config
tab.
Figure 24. Calibration_Auto Cal Configuration screen.
Calibration Gas Duration
Define how long you want each
calibration gas to flow through the
sensor before switching the gases.
The RCU automatically switches
the span and zero calibration gases
based on the calibration gas duration
times you specify.
Be sure to allow enough time for the gases to stabilize when you define these times.
Calibration Frequency
in days
Calibration Start Date
Click on the calendar or click on PC
Date/Time.
Calibration Start Time
Hours:Minutes:Seconds
Auto Calibration Enabled
This must be checked.
Next Calibrations Date/Time
This date and time must be later than
the Calibration Date and Time.
Calibration gas values entered under the Configuration_Cal Gas
Values tab, are visible on the Set Cal Gas Values and Timers screen.
Verify the values set for calibration or edit, if necessary.
Summary of Contents for Thermox WDG-V
Page 8: ...viii Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 16: ...xvi Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 22: ...1 6 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 34: ...2 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 57: ...Installation Guide 3 17 Figure 3 18 RCU flow diagram 3 Span Combustibles and Methane...
Page 58: ...3 18 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 64: ...3 24 Thermox WDG V VC VCM with Blow Back Figure 3 20 Wiring...
Page 73: ...AMEVision Display User Interface or Communications 4 5...
Page 76: ...4 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 88: ...5 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 91: ...Service and Parts 6 3 Figure 8 1a Wiring diagram for sensor...
Page 96: ...6 8 Thermox WDG V VC VCM with Blow Back Figure 8 3 Thermocouple replacement...
Page 100: ...6 12 Thermox WDG V VC VCM with Blow Back Figure 8 5 Flow sensor replacement...
Page 103: ...Service and Parts 6 15 Figure 8 7 Box Heater Replacement...
Page 105: ...Service and Parts 6 17 Figure 8 8 Combustible Block Heater Replacement...
Page 107: ...Service and Parts 6 19 Figure 8 9 Electronics Board Removal...
Page 114: ...7 4 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 118: ...A 4 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 126: ...A 12 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 132: ...A 18 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 137: ...PC Configurator Software A 23 Figure 23 Calibration_Calibration Results screen...
Page 138: ...A 24 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 144: ...A 30 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 156: ...A 42 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 164: ...A 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...