3-2 | Thermox WDG-V / VC / VCM with Blow Back
Analyzer Location
Observe the following guidelines when selecting an analyzer installation
location:
1. Select a readily accessible position for the analyzer to allow for routine
maintenance. Comfort levels for maintenance personnel should be
considered in placement of the sensor and AMEVision Display User
Interface.
2. The installation location should be free from excessive vibration and
the ambient temperature is required to be within the limits listed in
the specifications. If the ambient temperature is outside the specified
limits or the vibration is excessive, please contact AMETEK/Thermox
Sales or Service Department at (412) 828-9040. We have special options
to address ambient temperatures outside the listed specifications.
This chapter shows you how to install your WDG-V sensor components
and AMEVision Display User Interface, and includes the following sec-
tions:
• Inspection of Shipping Contents
• Mechanical Installation
• Wiring
If you have an oxygen-only analyzer without the combustibles option, the
combustibles and methane options described in this chapter do not apply.
These combustibles and methane sections are clearly identified. Likewise,
if you have the combustibles option, but not the methane option, you can
skip all sections pertaining to methane.
Inspect Shipping Contents
Remove any packing material from the WDG-V sensor. Check for damage.
If any is found, notify the shipper.
Summary of Contents for Thermox WDG-V
Page 8: ...viii Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 16: ...xvi Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 22: ...1 6 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 34: ...2 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 57: ...Installation Guide 3 17 Figure 3 18 RCU flow diagram 3 Span Combustibles and Methane...
Page 58: ...3 18 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 64: ...3 24 Thermox WDG V VC VCM with Blow Back Figure 3 20 Wiring...
Page 73: ...AMEVision Display User Interface or Communications 4 5...
Page 76: ...4 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 88: ...5 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 91: ...Service and Parts 6 3 Figure 8 1a Wiring diagram for sensor...
Page 96: ...6 8 Thermox WDG V VC VCM with Blow Back Figure 8 3 Thermocouple replacement...
Page 100: ...6 12 Thermox WDG V VC VCM with Blow Back Figure 8 5 Flow sensor replacement...
Page 103: ...Service and Parts 6 15 Figure 8 7 Box Heater Replacement...
Page 105: ...Service and Parts 6 17 Figure 8 8 Combustible Block Heater Replacement...
Page 107: ...Service and Parts 6 19 Figure 8 9 Electronics Board Removal...
Page 114: ...7 4 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 118: ...A 4 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 126: ...A 12 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 132: ...A 18 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 137: ...PC Configurator Software A 23 Figure 23 Calibration_Calibration Results screen...
Page 138: ...A 24 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 144: ...A 30 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 156: ...A 42 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 164: ...A 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...