
ELECTRICAL DIAGRAMS
31
12.
Field Wiring
Note: All field wiring must be done by a licensed electrician in compliance with the national and local
electrical codes.
Note: Electrician must provide seal-offs at every conduit entry on warmer side of panels. Seal inside and
around the conduits where passing through panels.
Make all the connections inside the j-box located on the door frame inside the walk-in, next to the vapor proof
light fixture.
If a stub-out construction was requested, all the connection wires will be stubbed-out thru the ceiling panel. In
this case, the field connections will be made in a j-box provided by the installer.
Consult the electrical schematics (, 98033-01, 98033-02) attached to the end of this manual for any special
lighting configuration (3 ways, 4 ways application).
Summary of Contents for Walk-in Monitoring System 200
Page 6: ...CONTROLLER 6 2 Controller...
Page 32: ...ELECTRICAL DIAGRAMS 32 13 Electrical Diagram 13 1 Wiring Diagram...
Page 33: ...ELECTRICAL DIAGRAMS 33...
Page 34: ...ELECTRICAL DIAGRAMS 34...
Page 35: ...ELECTRICAL DIAGRAMS 35...
Page 36: ...ELECTRICAL DIAGRAMS 36 13 2 PC Connection Wiring Diagram...