5.
Unlock the locking pins
2
on the loading board.
6.
Swivel the loading board
1
down.
7.
Secure the loading board with the locking lever.
CMS-I-00002563
8.
To open the hopper,
see "Using the hopper tarpaulin"
or
see "Using the hopper cover".
NOTE
The maximum filling capacity is reached when a
material cone is formed over the feed auger.
9.
Switch on the "red 2" tractor control unit at 32
litres/minute.
10. Slowly switch on the filling auger's drive on the
stop tap
1
.
The fill level in the fertiliser hopper rises.
11. Monitor the fill level.
12.
When the fill level approaches the edge of the
hopper,
reduce the filling auger speed with the stop tap.
13.
When the fertiliser hopper is full,
Slowly switch off the filling auger with the stop
tap.
14. Switch off the "beige" tractor control unit.
CMS-I-00003855
6 | Preparing the machine
Preparing the implement for operation
MG6492-EN-II | G.1 | 26.04.2021
59