6.4.2 Unfolding the lighting
1.
To be able to unfold the lighting,
raise the implement.
2.
Unfold both lighting panels
1
.
1
CMS-I-00003215
6.4.3 Folding the tramline marker onto the implement frame
1.
To move the track disc out of the ground,
slightly lift the implement.
2.
Remove the pin
1
from the pegging hole
3
.
3.
Put the swivel arm
4
into transport position.
4.
Peg the swivel arm in transport position
2
.
5.
To secure the pin in the adjuster segment,
turn the pin down.
1
4
3
1
2
CMS-I-00003216
6.4.4 Folding the implement
REQUIREMENTS
The road safety bars are installed
The lighting is unfolded
The tramline marker is folded
To fold the seeding combination,
see "Soil tillage implement" operating manual.
CMS-T-00004420-A.1
CMS-T-00004422-B.1
CMS-T-00004421-A.1
6 | Preparing the machine
Preparing the machine for road travel
MG6545-EN-II | B.1 | 22.07.2021
73