12. Install the adjacent bolts on the intermediate
segments.
13. Install the conveyor hose.
14. Install the hose clamp.
15. Install the cover.
16. Tighten the 4 knurled screws by hand.
17.
To ensure that all tramlines have the same
wheelmark width,
install additional tramline segments for all
tramlines.
18.
For the additional tramline segments to be
switched,
see section "Connecting tramline segments"
or
If fewer tramline segments are required,
see section "Disconnecting tramline segments".
6.3.13.4.2 Connecting the tramline segments
1.
Disconnect the plug connection between
1
and
5
.
2.
Establish the plug connection between
1
and
3
.
3.
Establish the plug connection between
4
and
5
.
The new tramline segment
2
will be switched.
4.
To ensure that all tramlines have the same
wheelmark width,
connect all of the additional tramline segments.
CMS-I-00003194
CMS-T-00004380-B.1
6 | Preparing the machine
Preparing the implement for operation
MG6545-EN-II | B.1 | 22.07.2021
69