Supervisor 5000 Installation Instructions
PUD3667R1-6
For assistance: [email protected] +1 (909) 591-8431
Page 9
Seal the floor area around the conduits running up and
into the cabinets. This will prevent condensation and
debris build-up coming from whatever may be below
the floor.
Environmental Requirements
Conduit Requirements
• DO
NOT
install the product outdoors. This product is intended for indoor use only.
• DO NOT
install the SU5000 where infrared lighting (strobe lights, flash photography, etc.) is in the direct path
of the
optical sensors. Interference may affect the performance of the turnstile.
The following are suggested operating temperature and humidity ranges for the SU5000:
Operation
Non-Operation/Storage
Temperature Range
10-32°C / 50-90°F
0-40°C / 32-104°F
Humidity Range (Non-Condensing)
15% - 85% RH
--
Power Supply
110-120 VAC, 60 Hz or 220/240 VAC, 50 Hz
Power Requirements
Peak power consumption is 300W per lane with all options installed
Operational Voltage
Primary power is stepped down and rectified for low-voltage 24 VDC, 12 VDC,
and 5 VDC operation
Fuse
2.5A (slo-blo) located in the master cabinet
Drive Motor
24 VDC (brushless)
Surge Protection
Alvarado suggests the use of surge protection on the high-voltage power line to
further protect electronics
Operating the SU5000 outside the listed temperature and humidity ranges may negatively affect turnstile
performance, and could potentially cause damage to the turnstile and void the warranty.
Fig. 5
SU5000 Conduit Lines
NOTE
Electrical Requirements
CAUTION
Symbology
Description
Conduit Size
Primary
Power**
3/4”
Access Control /
Ethernet
3/4”
Access
Control
3/4”
Crossover
Cable
1.5”
The opening for the conduit in the center of each cabinet
is 6.50” x 2.50” (165mm x 64mm). The three required
conduits
MUST fit in this area [Figure 5].
For multi-lane conduit requirements, refer to
Appendix E on Page 39.
**If the External DC Power Supply option was ordered,
use this conduit to route 24VDC.
NOTE
NOTE
Summary of Contents for SU5000
Page 44: ......