Supervisor 5000 Installation Instructions
Page 36
For assistance: [email protected] +1 (909) 591-8431 PUD3667R1-6
Connect Primary Power to Enclosure(s)
G
N
L
Primary
Power
Primary Power
Terminal Block
The primary wiring lines for 110VAC and 220VAC consist of the
following:
Terminal
110V
220V
L
ine
Black
Brown
N
eutral
White
Blue
G
round
Green
Green/Yellow
3. Route primary power conduit to one of the supplied conduit
holes on the enclosure [Figure D3].
4. Locate the pre-installed primary power terminal block
[Figure D3]. There is one primary power terminal block per
enclosure.
5. Attach each primary power wire to the primary power
terminal block according to the table above [Figure D3A].
6. Using a Phillips-head screwdriver, tighten each terminal
block connection.
7. Attach the supplied protective cover on the terminial block.
8. Repeat Steps 3 for 7 for additional power supply
enclosures.
Fig. D3
Primary Power Terminal Block
Fig. D3A
Primary power wiring and connectors are not supplied by
Alvarado.
NOTE
Conduit
Hole
Conduit
Hole