Supervisor 5000 Installation Instructions
Page 30
For assistance: [email protected] +1 (909) 591-8431 PUD3667R1-6
Post-Installation Checklist
1. Power On
SU5000 boots up successfully.
2. Lane Functionality
User status displays and open / closed status lights are functioning properly.
Auditory alarms are playing back correctly.
Barriers move smoothly between the open and closed positions.
3. Access Control Integration
Installed card readers are successfully reading credentials.
Valid credentials are activating the turnstile.
4. Barrier Alignment
Barriers are properly aligned in both the open and closed positions.
Barriers aligned in the Home position.
5. Attachment
Barriers, cabinet lids, end covers, and base covers are securely fastened to the turnstile.
6. Wipe Down Turnstile
Acrylic - Wipe down acrylic barriers using a soft cloth and cleaner suitable for acrylic surfaces. We recommend
Brillianize and Novus #1 acrylic cleaners.
Stainless Steel – Wipe down stainless steel with a damp cloth or use Alvarado's recommended
commercial products (see
SU5000 User Guide
).
Powder Coated - Wipe down power coated surfaces with a damp cloth.
7.
Manuals Handoff
Provide both these
SU5000 Installation Instructions
and the
SU5000
User Guide
to the project or site manager.
Summary of Contents for SU5000
Page 44: ......