3.1 Switch on
3.2 Switch off
3.3 Emergency Procedure
Step 3
Enter the password "0001" and
confirm the entry by pressing the Enter
key.
Step 5
Set the communication address and communication baud rate in the communica-
tion setting interface. When the meter is used as Grid meter (DC, AC/Hybrid system), the
address is set to “005”. When it is used as the PV meter (AC/Hybrid system), the address
is set to “006”. The baud rate is set to 9600.
When turning on the system, it is very important to follow the order of the following
steps to prevent damage to the system.
WARNING: Please check the installation again before turning on the system.
When the SMILE5 energy storage system appears to be running abnormally you can turn
off the grid connected main switch directly feeding the BESS and turn off all load switches
within the BESS, turn off the battery switch at the same time. To prevent a potentially fatal
personal injury, if you want to repair or open the machine after the power is switched off,
please measure the voltage at the input terminals with a suitably calibrated voltage tester.
Before working on this equipment, please confirm that there is no grid electric supply to
the BESS!
The upper cover plate cannot be opened until 15 minutes after the DC-link capacitance
inside the battery modules is discharged completely
Step 1:
Open the outer shell of the cable box. Unlock then open the inner cover of
the cable box.
Step 2:
Press the power button on all the batteries, till the lights turn off.
Step 3:
Turn off the Battery switch.
Step 4:
Turn off the Grid switch.
Step 5:
If backup load is applied, turn off the Backup switch.
Step 6:
Turn off the PV switch on the cable box.
Step 7:
Close the inner cover and outer shell of the cable box.
More information can be found in SMILE5-BAT user manual.
Step 4
Select the menu item "Comm" in
the settings menu to change to the
communication settings.
SYSTEM OPERATION
03
SYSTEM OPERATION
SYSTEM OPERATION
Step 1:
Open the outer shell of the cable box.
Step 2:
Unlock then open the inner cover of the cable box. The
cable box locker can be opened without tools.
Step 3:
Turn on the PV switch on the cable box.
Step 4:
Turn on the Grid switch.
Step 5:
If backup load is applied, connect it to Backup ports
and turn on the Backup switch; if not, then keep the Backup
switch off.
Step 6:
Turn on the Battery
switch.
Step 7:
Press the power button
on all the batteries until the
indicator lights is turned on.
Step 8:
Close the inner cover and
the outer shell of the cable box.
Note:
the Backup switch is only used when a backup
load is applied.
32
33
1
2
FN
Set
Config
AOUT
Timer
Comm
Tarriof
Others
Version
DOUT
FN
Set
ADDR
005
9600
BAUD
MODE NONE
645000000000000
FN
Set
0 0 0 1