2.3.2.1 SM60A connect (with meter plug), if applicable:
Figure 40 SM60A connect (with meter plug)
2.3.2 Meter SM60A (If Applicable)
2.3.3 ACR10R Meter (If Applicable)
2.3.3.1 ACR10R single-phase connection
2.3.3.2 ACR10R three-phase connection
2.3.2.2 SM60A connect (without meter plug), if applicable:
Figure 41 SM60A connect (without meter plug)
AlphaESS
3
5
6
6
5
6
RS485 PIN
Grid Meter
RS485 PORT
PV Meter
RS485 PORT
Meter1
Cabinet
Meter2
PE
BACK-UP GRID
G L
N G L
N
LAN1
LAN2 BAT
DRMs
METER
PE
BACK-UP GRID
G L
N G L
N
LAN1
LAN2 BAT
DRMs
METER
PE
BACK-UP GRID
G L
N G L
N
LAN1
LAN2 BAT
DRMs
METER
PE
BACK-UP GRID
G L
N G L
N
LAN1
LAN2 BAT
DRMs
METER
INSTALLATION
INSTALLATION
Note:
If the ADL3000 meter with CT is used as a grid meter, the direction of arrow in CT
should point away from the grid to the energy storage system.
If the ADL3000 meter with CT is used as a PV meter in AC- or hybrid-coupled system,
the direction of arrow in CT should point away from the PV inverter to the energy
storage system.
For AC/Hybrid system, there are two meter needed:
Note:
Connect the power meter (PIN 5, 6) to the meter port of the cable box (PIN 3, 6)
using the RJ45 cable.
Note:
Connect the power meter (PIN 21, 22) to the meter port of the cable box (PIN 3,
6) using the RJ45 cable.
Figure 42 Two Meter Connect,
with Meter Plug
Figure 43 Two Meter Connect, without
Meter Plug
Figure 44 ACR10R single-phase connection (if applicable)
Figure 45 CT meter three-phase connection (if applicable)
Option 1: with Meter Plug
Option 2: without Meter Plug
Plug1
Plug2
26
27
LOAD
GRID
Grid Meter
Grid CT
GRID
LOAD
LOAD
GRID
Grid Meter
Grid CT
GRID
LOAD
L L’ N N’
5 67 8
L L’ N N’
5 67 8
Plug2
RJ45
6
3
RJ45
RS485
6
3
RJ45
RS485
6
3
RJ45
RS485