Step 1
Click the “Enter” button to enter
the menu interface.
Step 3
You will get into the code
interface. Then click the “Shift” button
to enter the address interface.
Step 4
Please set the meter address by
using the “Value adjusting” button, the Grid
meter (DC, AC and Hybrid system) address
is set to 003, and the PV meter (AC and
Hybrid system) address is set to 004.
2.3.5.1 SM60A
2.3.4 Backup Box (If Applicable)
2.3.5 Meter setting
If the ACR10 meter is used as a grid meter, the direction of arrow in CT should point
away from the grid to the energy storage system.
If the ACR10R meter is used as a PV meter in hybrid system, the direction of arrow in CT
should point away from the PV inverter to the energy storage system.
Backup Box Connect to SMILE5 (single-phase grid in house):
Figure 47 Backup Box Connect to SMILE5 (single-phase grid in house)
Figure 48 Backup Box Connect to SMILE5 (three-phase grid in house)
GRID_N
GRID_L3
GRID_L2
GRID_L1
Storion-S5
ECO-ES5
SMILE5
PV-INV
BACK
AC
N
L
L
N
PV
PV
Bat
meter
LOAD3
LOAD2
LOAD1
GRID
N
DSP_BackupBox
BAK_N
AC_N
LOAD_N
BAK_L3
AC_L3
LOAD_L3
BAK_L2
AC_L2
LOAD_L2
BAK_L1
AC_L1
LOAD_L1
Ś
ś
PV-INV_L1
PV-INV_L2
PV-INV_L3
PV-INV_N
L
N
L
GRID_PE
PV-INV_PE
PE
PE
PE
COM
patch cable
m
et
er
p
at
ch
ca
bl
e
fo
r b
ac
ku
p
bo
x
Meter Port
pa
tc
h
ca
bl
e
RCD
patch cable
Backup Box Connect to SMILE5 (three-phase grid in house):
GRID_N
GRID_L3
GRID_L2
GRID_L1
Storion-S5
ECO-ES5
SMILE5
PV-INV
BACK
AC
N
L
L
N
PV
PV
Bat
meter
LOAD3
LOAD2
LOAD1
GRID
DSP_BackupBox
BAK_N
AC_N
LOAD_N
BAK_L3
AC_L3
LOAD_L3
BAK_L2
AC_L2
LOAD_L2
BAK_L1
AC_L1
LOAD_L1
Ś
ś
PV-INV_L1
PV-INV_L2
PV-INV_L3
PV-INV_N
N
GRID_PE
PV-INV_PE
PE
PE
COM
patch cable
m
et
er
p
at
ch
ca
bl
e
fo
r b
ac
ku
p
bo
x
Meter Port
pa
tc
h
ca
bl
e
RCD
L1
L3
L2
N
PE
L
patch cable
There are 3 buttons on the front of the
electricity meter:
1. Down arrow: shift button
2. Up arrow: value adjusting
3. Enter button / Menu button
Step 2
Click the “Enter” button to input the
password. The initial password is 0000.
Then click the “Enter” button.
Step 5
Click the “Enter” button to get
back to the menu interface. Then click
the “Shift” button 5 times to enter the
interface for saving.
Step 6
Click the “Shift” button to save the
setting.
AlphaESS
3
21
6
22
21
22
RS485 PIN
Grid Meter
RS485 PORT
PV Meter
RS485 PORT
Meter1
Cabinet
Meter2
0000
0000
kWh
PASS
CODE
A-
003
S-
NO
ADDR
CODE
ADDR
S-
YES
PASS
INSTALLATION
INSTALLATION
For AC/Hybrid system, there are two meter needed:
without Meter Plug
Figure 46 Two Meter Connect, without Meter Plug
28
29