Table 1 CT meter ratio and accuracy table
Figure 30 ADL-3000 single-phase Connect (with CT, without Meter Plug)
Figure 31 ADL-3000 single-phase Connect (without CT, with Meter plug)
Figure 32 ADL-3000 single-phase Connect (with CT, without Meter plug)
Figure 33 ADL-3000 single-phase Connect (with CT, with Meter plug)
2.3 Power Meter
2.3.1 Meter ADL-3000 (If Applicable)
2.3.1.1 Single-phase in house
ADL-3000 single-phase connection (without CT, without meter plug), if applicable:
ADL-3000 single-phase connection (without CT, without meter plug), if applicable:
ADL-3000 single-phase connection (with CT, without meter plug), if applicable:
ADL-3000 single-phase connection (with CT, without meter plug), if applicable:
Any product damage or property loss caused by the following conditions AlphaESS does
not assume any direct or indirect liability.
ADL-3000:
three-/ single-phase meter (with or without CT)
SM60A:
single-phase meter
Backup Box:
three-/ single-phase meter (Contain off-grid switching and load
management)
ACR10R:
Three-phase CT electric meter
LOAD
LOAD
LOAD
PE
BACK-UP GRID
G L
N G L
N
LAN1
LAN2 BAT
DRMs
METER
PE
BACK-UP GRID
G L
N G L
N
LAN1
LAN2 BAT
DRMs
METER
PE
BACK-UP GRID
G L
N G L
N
LAN1
LAN2 BAT
DRMs
METER
LOAD
PE
BACK-UP GRID
G L
N G L
N
LAN1
LAN2 BAT
DRMs
METER
INSTALLATION
INSTALLATION
ADL3000-N/CT & 300A/5A CT
ADL3000-N/CT & 400A/5A CT
ADL3000-N/CT & 400A/1A CT
ACR10R-200A CT
ACR10R-120A CT
60
80
400
200
120
0.6 kWh
0.8 kWh
4.0 kWh
2.0 kWh
1.2 kWh
Model
CT ratio
Accuracy
ADL-3000
L1
L2
L3
N
21 22
L1’
L2’
L3’
Note:
Connect the power meter (PIN 7, 8) to the meter port of the cable box (PIN 3, 6)
using the RJ45 cable.
Note:
Connect the power meter (PIN 7, 8) to the meter port of the cable box (PIN 3, 6)
using the RJ45 cable.
22
23
GRID
6
3
RJ45
RJ45
RS485
ADL-3000
L1
S1
S2
L1’ L2’
L3’
L2
9 10
1112
L3
N
N’
GRID
6
3
7 8
RJ45
RS485
S1
S2
ADL-3000
L1
L1’ L2’
L3’
L2
9 10
1112
L3
N
N’
GRID
7 8 Plug
RJ45
ADL-3000
L1
L2
L3
N
21 22
L1’
L2’
L3’
Plug
GRID