![Alpha ESS ES-Alpha-Smile 5-10KWH-v2 Installation, Operation & Maintenance Manual Download Page 79](http://html.mh-extra.com/html/alpha-ess/es-alpha-smile-5-10kwh-v2/es-alpha-smile-5-10kwh-v2_installation-operation-and-maintenance-manual_2905569079.webp)
COMMISSIONING
77
AC Mode
Three mode options: DC/
AC
/Hybrid
You can set the allowable feed-in ratio from 0%-100%.
Note:
When the safety standard is set as AS4777.2 (Australia and New Zealand), the
secondary sub-options can be selected according to the region or local grid
company.
On the grid side, if only a CT is installed, please select CT for grid side.
If the grid meter is installed, please select Meter for grid side. If this meter is a
CT meter and the CT ratio is not 1, please select CT below and input the Meter
CT Ratio. If this meter is not a CT meter or the CT ratio is 1, please do not
Click “Submit” when the
settings are complete.
PV capacity on the PV-inverter (on-grid) side