![Alpha ESS ES-Alpha-Smile 5-10KWH-v2 Installation, Operation & Maintenance Manual Download Page 35](http://html.mh-extra.com/html/alpha-ess/es-alpha-smile-5-10kwh-v2/es-alpha-smile-5-10kwh-v2_installation-operation-and-maintenance-manual_2905569035.webp)
Mounting
33
5.
Mounting
5.1.
Checking the Outer Packing
Before unpacking the product, check the outer packing for damage, such as holes and
cracks. If any damage is found, do not unpack the product and contact your dealer as
soon as possible.
5.2.
Scope of Delivery
Check the scope of delivery for completeness and any externally visible damage.
Contact your distributor if the scope of delivery is incomplete or damaged.
SMILE5-INV
SMILE5-INV
X1
Cable Cover
X1
Holder for
Cable Cover X2
Wall Bracket
X1
Backup
Connector X1
Grid Connector
X1
PV + Connectors
X2
PV -Connectors
X2
T20 Screwdriver
X1
WiFi Module
X1
6 Pin AUX Ter-
minal Block X1
M5*12 Screw
X2
Ground ring Ter-
minal Lug X3
Documentation
sheets
X1
Communication
Cable X1
Wall Anchor
ST6*55 X6
M4856-P
Position Plate
X1
SMILE-Bat Series
Position Plate
X1