![Alpha ESS ES-Alpha-Smile 5-10KWH-v2 Installation, Operation & Maintenance Manual Download Page 44](http://html.mh-extra.com/html/alpha-ess/es-alpha-smile-5-10kwh-v2/es-alpha-smile-5-10kwh-v2_installation-operation-and-maintenance-manual_2905569044.webp)
Mounting
42
1) Secure the expansion bracket to the M4856-P wall bracket to be mounted on its
bottom with two nuts provided.
2) Place the above assembly to the below M4856-P wall bracket on the top positioning
fit, and then mark the drill positions.
3) Set the wall bracket aside and drill the marked holes with drill
Φ10
.
4) Insert screw anchors into the drill holes, secure the wall bracket horizontally using
the provided screws.
5) Pick up the battery into the wall mounting bracket. Secure the battery to the wall
mounting bracket, tighten them with four screws using a Torx screwdriver(TX 20,
torque:2.5Nm).